Cold room floor panel bears pallet, forklift and stacking cargo load; floor structure is the most easily neglected part of cold room insulation design. Light pedestrian cold room: standard PU floor panel with reinforced surface; forklift working cold room needs concrete load layer above insulation. Typical floor structure from bottom up: compacted ground → PE moisture barrier film → PU insulation panel → steel mesh reinforced concrete layer. Moisture barrier film (0.2mm PE) must be fully overlapped and sealed; underground water vapor rising penetrates foam and makes insulation fail. Xiteliduo cold room PU floor panel HS 940600 adopts high density PU core, special wear-resistant surface for light load cold room. Low temperature cold room floor needs anti-heave design; soil water freezing under floor will expand and push floor upward, crack concrete and panel. Heating wire under floor insulation is the mainstream anti-freeze heave solution for -18℃ and below cold storage, keep subsoil temperature above 0℃. Floor drainage trench inside cold room must be heat isolated; trench without insulation forms heat bridge and frost block frequently. Floor expansion joint is reserved for concrete layer; temperature shrink and expansion will crack floor slab without reserved joint. Refrigeration maintenance & repair company checks floor surface crack and local bulge; bulge is typical signal of subsoil frost heave.
الخدمات الفنية: +86-575-83665888؛ 83068555 خط خدمة الضاغط: +86-18157593311 خط خدمة أنابيب التسخين الكهربائي: +86-13857577938 البريد الإلكتروني: helenliu1983xtld@gmail.com مصنع أنابيب التسخين الكهربائي: رقم 150، قرية دونغهو، بلدة غانلين، مدينة شنغتشو، مدينة شاوشيونغ مصنع الضاغط: رقم 679، منطقة التنمية الاقتصادية دونغو، مدينة شنغتشو، مدينة شاوشيونغ
حقوق الطبع والنشر © 2026 شركة تشجيانغ زيتيليدو للتكنولوجيا البيئية المحدودة وشركة شينغتشوانلي للتكنولوجيا البيئية المحدودة. جميع الحقوق محفوظة.