Machine room commissioning is the final verification of the whole refrigeration system after installation, before formal handover. Standard start-up sequence: visual inspection → leak test → vacuum → refrigerant charging → oil check → single component test → load running. Leak test: pressurize with dry nitrogen, hold pressure and detect leak; vacuum target below 500 microns for POE oil system. Charging: charge liquid refrigerant into receiver side; never charge liquid directly into compressor suction port. Commissioning key parameters: superheat, subcooling, condensing pressure, suction pressure, oil level, defrost termination temperature. Xiteliduo provides commissioning checklist, operation manual and alarm troubleshooting document together with equipment. Acceptance items: temperature stability, pull-down time, running current, noise, vibration, all alarm function test. Operation log record: daily room temperature, pressure, ambient temperature, running hour, alarm event and maintenance action. Training for end user: normal operation, alarm judgment, forbidden operation, safe pump down procedure and refrigerant handling. Handover standard: all test data recorded, drawings updated as-built, spare parts list submitted. Refrigeration maintenance & repair company recommends 72 hours continuous load running test before final acceptance.
الخدمات الفنية: +86-575-83665888؛ 83068555 خط خدمة الضاغط: +86-18157593311 خط خدمة أنابيب التسخين الكهربائي: +86-13857577938 البريد الإلكتروني: helenliu1983xtld@gmail.com مصنع أنابيب التسخين الكهربائي: رقم 150، قرية دونغهو، بلدة غانلين، مدينة شنغتشو، مدينة شاوشيونغ مصنع الضاغط: رقم 679، منطقة التنمية الاقتصادية دونغو، مدينة شنغتشو، مدينة شاوشيونغ
حقوق الطبع والنشر © 2026 شركة تشجيانغ زيتيليدو للتكنولوجيا البيئية المحدودة وشركة شينغتشوانلي للتكنولوجيا البيئية المحدودة. جميع الحقوق محفوظة.